ASIC Methodology
How do we obtain objective information
from a construction site
Get a presentation
with a detailed description
of our methodology
You will see that the foundation of our product
is the experience of Russian and European builders
transferred into a digital environment.
By clicking the button, you consent to the processing of personal data and agree to the privacy policy
ASIC Methodology
Use this tool to create the required depth of statistical control
Equating types of work
Use this tool to achieve the required depth of statistical control.
Linking the “layer stacks” of process cards to the object structure
Thus, control points are formed, through which we know the types, labor effort, and volumes of all kinds of work.
Simulation of a work production schedule chart
The schedule is created based on the types of work in the project, and we will build
a control chart for it.
Creating a control chart
The control schedule is built based on "virtual points" representing the location of each room of the facility.
Execution of the control schedule
A trained inspector, using a standardized method under the control of the system’s algorithms, enters actual data on the execution of work for each Standard Technological Map at all control points from the control schedule.
Automatic processing of received information
Information from the controller is sent to the server, and the system’s algorithms generate the corresponding report:

  • Deviations by technological process maps, locations, performers — time and volume
  • Deviations by technological process maps, locations, performers — time and quality
Sending the received information
The certificate is fed into the analysis matrix and, based on the result, receives one indication or another. The generated reports are sent to the appropriate employees according to their access level.

  • Generation of the "Construction Site Safety Control Schedule";
  • Parallel Execution of the "ASIC Control Schedule" and the "Site Safety Control Schedule";
  • Generation of the Report "ASIC Construction Site Safety".
Interpretation of statistical information
“ASIС” Startup 3.00 in its initial version generates a Report for the given period. The Report is exported in PDF format; it can be sent by email or printed. Additionally, a number of reports are generated in the “Operational Management” module, on the basis of which regular planning meetings can be held. According to ASIС standards, all information obtained from control algorithms seeks its end user—this means that reports are automatically sent to the responsible employees.
We will help you make managerial decisions more effectively
  • Work on
    any device
    The ASIС interface is designed to meet the demands of work on
    a construction site.
  • Use an intuitive interface
    We have developed an intuitive and simple interface that can be easily learned
    in a minimal amount of time.
  • Keep your documents
    in order
    All uploaded data and statistical reports are always at hand. These data will never be lost or compromised.
  • Work from anywhere
    on the planet
    Are your sites in different locations? Stay connected with all construction sites regardless of where they are and communicate in real time without missing any project details.
  • Receive monthly
    reports
    Regular reports contain all the details and information you need on the current status of the project.
  • Use
    integrations
    Use our import algorithms to migrate your projects from Microsoft Project and other project management tools without losing data or time.