“ASIС” operated at these building sites
How is the information from the facility being provided now?
All existing tools represent "System Document Management," where a person/expert enters their decision or opinion. This approach is used by all BIM (3D) designers who try to implement "office-based solutions" on construction sites.

Our approach focuses on automating the control of the person who enters information into the system. This is possible through the use of statistical sampling algorithms and comparison algorithms for monitoring results.

Over the past few years, BIM has made significant progress in the design process.

BIM for architectural and construction control has also advanced to solutions such as BIM 365, etc.

These solutions, unlike ASIC products, rely solely on "human will," which significantly increases the requirements for personnel expertise and can lead to information distortion.

In ASIC products, the entire functionality is based on the generation of "hypotheses" and "scenarios."

Project management and control composition are conducted under the supervision of automated project management.

As a result, deviations are recorded digitally, without the influence of human factors.

Obtaining information without the influence of the human factor
Objective control exists only when information is transferred from a person to a machine and from a machine back to a person.

This is the only way to achieve objective statistical control, which can be transmitted over long distances without distortion.

The ASIC platform allows you to build information models for construction projects and maintain a shared information space among all project participants.

ASIC - REMOTE STATISTICAL CONTROL MACHINE

How does the unified information field for managing a construction project work?
Creating a digital object structure
Use this tool to create the necessary depth of further statistical control.
Equating types of work
Use this tool to display your project's work types in a standardized format.
Linking the "pies" of process maps to the structure of the object
BY USING THIS TOOL, WE CAN CREATE CONTROL POINTS THAT WILL TELL US THE TYPES, LABOR COSTS, AND VOLUMES OF ALL TYPES OF WORK AT THE LOCATIONS OF THE OBJECT.
Simulation of the work schedule
The schedule is created based on the types of work in the project, and we will create a control schedule for it.
Creating a control schedule
The control schedule is based on the "virtual points" of each room's location.
Execution of the control schedule
TRAINED BY A STANDARDIZED METHOD UNDER THE CONTROL OF THE SYSTEM'S ALGORITHMS, THE CONTROLLER RECORDS THE ACTUAL DATA ON THE PERFORMANCE OF WORK ON EACH STANDARD TECHNOLOGICAL MAP AT ALL CONTROL POINTS OF THE CONTROL SCHEDULE.
Automatic processing of the received information
The information from the controller gets to the server and the system's algorithms generate the appropriate help:

  • Deviations by TTK, locations, and performers - time and volume.
  • Deviations by TTK, locations, and performers - time and quality.
Sending the received information
THE HELP GETS INTO THE ANALYSIS MATRIX AND, BASED ON THE RESULT, RECEIVES ONE OR ANOTHER INDICATION ON THE OBJECT PLAN. THE RECEIVED REPORTS ARE SENT TO THE RESPONSIBLE EMPLOYEES ACCORDING TO THE ACCESS LEVEL.

  • Generation of a "Construction Site Security Monitoring Schedule";
  • Execution in parallel with the "ASIC Control Schedule" and "Site Safety Control Schedule";
  • Generation of the Report "ASIC Site Construction Safety".
Interpretation of statistical information
ASIC STARTUP 3.33 GENERATES A REPORT IN ITS INITIAL VERSION, ON THE BASIS OF WHICH REGULAR MEETINGS CAN BE HELD. THE REPORT WILL SHOW THE SOURCE OF EACH DEVIATION IN TIME AND QUALITY OF THE QMS.
STATISTICAL
MACHINE CONTROL
NOW, INSTEAD OF REPORTS FROM EMPLOYEES, YOU WILL RECEIVE INFORMATION GENERATED BY THE SYSTEM'S ALGORITHMS ABOUT THE REAL PICTURE OF ALL THE QMS AT THE CONTROL FACILITY.
The planning sessions will show a real Fact-Plan for the facility, detailing the reasons for the deviation to the specific types of work of each contractor on a specific floor, in any apartment, room.
To obtain an objective picture from the construction site, you will need:
PREPARE
an employee according
to the instructions
Configure
an ASIC machine according to the instructions
Start
the machine to carry out monitoring of compliance with the schedules
for data loading
Provide the results
in the form of a report
MACHINE STATISTICAL CONTROL IS FULLY AVAILABLE OUT OF THE BOX
THIS IS POSSIBLE BECAUSE “ASIC” WAS CREATED BY BUILDERS FOR BUILDERS.

The boxed version of "ASIC" includes hardware with preinstalled software and job descriptions for employees.

The boxed version includes:
  • Laptop
  • 2 smartphones
  • “ASIC” instruction manual
  • Documentation for the Chief Engineer
  • Documentation for the Project Manager
  • Documentation for the Chief Financial Officer
  • Documentation for the Director of Development
  • Documentation for the IT Director
Implementation of ASIK StartUp 3.33 is not required!
You only need to familiarize yourself with the instructions and perform a test setup of the system for further work on your project.
1 day
1 day
Conclusion of a contract
3 day
3 day
Delivery of the “ASIC” case
4 -6 days
4 -6 days
Reading instructions
The instructions are designed so that specialists can freely use the information model “ASIC”, just as they use a stove in the kitchen.
6 - 14 days
6 - 14 days
Test setup of a digital model
During the test configuration stage, any misunderstandings encountered while working with the digital model will be identified, and our support engineers will help resolve them. They will be available both to answer your questions and to provide hands-on assistance with the setup.
from 15 day
from 15 day
Using “ASIC” on your real data
Facilities in the Northwest were commissioned using ASIC control
Construction volumes were commissioned
Savings were achieved on each facility from investment expenditures
58
6 303 608 sq.m.
from 15 to 25%
Our experience
Achievements of machine statistical control
over 9 years
Made on
Tilda